Barrick Gold | North Mara Gold Mine: Dewatering & Paste Plant Project

Advancing Underground Support: North Mara Dewatering & Paste Plant

Download the Full Case Study

Discover how 4Sight OT Automation helped modernise Barrick North Mara’s Gokona underground operations, delivering a state-of-the-art automated paste fill control system that eliminated haulage bottlenecks, enhanced structural safety, and optimised operational costs for one of Tanzania's premier gold mining facilities.

Get instant access to the full Barrick North Mara Paste Fill Project Case Study.

✅ Learn how 4Sight OT Automation replaced a legacy Cemented Aggregate Fill (CAF) process with a fully automated surface and underground distribution system
✅ Discover how two Rockwell PLCs managing 800 IO points, 10 remote IO (RIO) panels, and 140 drives streamlined underground material flow
✅ Explore the integration of Plants SCADA 2018 with redundant servers and client workstations for reliable plant-wide visibility
✅ See how a Cisco switch-based ring network linked RIO panels and motor control centers (MCCs) to boost network resilience
✅ Understand how reducing dump truck reliance lowered transport costs, ensured consistent backfill quality, and safeguarded long-term mining schedules